The SCEAS System
Navigation Menu

Conferences in DBLP

IFIP TC5/WG5.3 Publications (ifip5-3)
1992 (conf/ifip5-3/1992)

  1. Roland D. Weill
    Short Introduction to the Concept of "Concurrent Engineering". [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:1-4 [Conf]
  2. A. Sharon
    The biggest bottlenecks in concurrent engineering. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:5-13 [Conf]
  3. Frank-Lothar Krause, B. Ochs
    Potential and Advanced Concurrent Engineering Methods. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:15-28 [Conf]
  4. F. Féru, E. Cocquebert, H. Chaouch, D. Deneux, René Soenen
    Feature based modeling: sate of the art and evolution. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:29-50 [Conf]
  5. J. P. Kruth
    New Manufacturing Techniques for Rapid Prototyping and Concurrent Engineering. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:51-83 [Conf]
  6. W. Loeve
    Engineering of Systems for Application of Scientific Computing in Industry. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:83-109 [Conf]
  7. David Barkan
    Computer Vision Upgrades Microelectronics Assembly. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:111-123 [Conf]
  8. Rilly Maayan
    The Two Stage M. M. I. S. Model as implemented at Elscint. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:125-128 [Conf]
  9. Haim Sakat
    Manufacturing Technology System. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:129-133 [Conf]
  10. B. I. Cherpakov
    Potentialities of Cooperation in the Field of State of the Art Technologies. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:135-142 [Conf]
  11. Gideon Halevi
    The Magic Matrix as Smart Scheduler, Concurrent and CAPM. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:143-158 [Conf]
  12. Gideon Halevi
    Topics for the Round Table Discussion on Concurrent Engineering. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:159-160 [Conf]
  13. Roland D. Weill
    Round Table Discussion of Concurrent Engineering. [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:161-164 [Conf]
  14. Gideon Halevi
    Report on TC5 CATE TASK FORCE (Computer Aided Effective Task Force). [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:165-176 [Conf]
  15. Gideon Halevi, Roland D. Weill
    Report on CIRP Review about C. A. P. P. (Computer Aided Process Planing). [Citation Graph (0, 0)][DBLP]
    Manufacturing in the Era of Concurrent Engineering, 1992, pp:177-188 [Conf]
NOTICE1
System may not be available sometimes or not working properly, since it is still in development with continuous upgrades
NOTICE2
The rankings that are presented on this page should NOT be considered as formal since the citation info is incomplete in DBLP
 
System created by asidirop@csd.auth.gr [http://users.auth.gr/~asidirop/] © 2002
for Data Engineering Laboratory, Department of Informatics, Aristotle University © 2002